logo

Dongguan Chuangrui New Energy Co., Ltd topfer99@126.com 86--13018677119

Dongguan Chuangrui New Energy Co., Ltd Company Profile
products
Home > products > Power Supply Test System > Power Supply ATE With High Voltage Test Power Supply Automatic Battery Comprehensive Tester

Power Supply ATE With High Voltage Test Power Supply Automatic Battery Comprehensive Tester

Product Details

Place of Origin: China

Brand Name: Topfer

Model Number: Top-Smart 2000

Payment & Shipping Terms

Minimum Order Quantity: one set

Price: to be discussed

Packaging Details: wooden crate

Delivery Time: 2 to 3 weeks

Payment Terms: T/T

Supply Ability: 10 sets /30 days

Get Best Price
Product Details
Highlight:

Automatic Battery Comprehensive Tester

,

Power Supply Battery Comprehensive Tester

,

ATE Battery Comprehensive Tester

Color:
Gray
Simultaneously Measurable:
4-16 Power Supply Products
Altitude:
1.7m
Customizable:
Yes
Product Usage:
Automatic Testing For Adapter Products
Function:
Rapidly Test The Performance Of Various Power Supply Products.
Color:
Gray
Simultaneously Measurable:
4-16 Power Supply Products
Altitude:
1.7m
Customizable:
Yes
Product Usage:
Automatic Testing For Adapter Products
Function:
Rapidly Test The Performance Of Various Power Supply Products.
Product Description

Factory direct sales power supply ATE with high-voltage test power supply, automatic tester, battery comprehensive tester

 

The eight benefits of the automatic power supply testing system are:

1. Fast speed, high efficiency and strong reliability;

2. Large-scale production can significantly reduce the usage cost (compared with manual testing).

3. It can automatically generate test reports for convenient reference at any time.

4. Possess statistical analysis capabilities for defective products and can assist engineers in analyzing the causes of defective products

5. The system design is flexible and can be customized according to the customer's own needs.

6. Stable and reliable, select the best equipment combination to complete various tests;

7. The price of the power supply testing system is controllable. According to the customer's own needs, they can choose some testing equipment with the best cost performance during use to reduce the price of the entire system.

8. Economical and cost-effective, the customer's existing suitable equipment can be applied to the power supply testing system, avoiding the waste of the original equipment caused by the customer's equipment update.

 

Open

     • An open hardware platform that allows for the addition or removal of various testing devices according to customer needs (including devices with GPIB, RS-232, USB interfaces, etc.)

     • The ATE power supply testing system supports simultaneous testing of multiple single-group/multiple-group output power supplies, significantly increasing production line capacity.

     • An open software platform, the ATE power supply testing system can be expanded with new test items and functions based on customer testing requirements.

     • The ATE power supply testing system supports simultaneous multi-lane barcode pre-scanning and scanning during testing, enhancing overall testing speed.

 

Universal

    • The ATE power supply testing system supports testing of various power supplies (LED power supplies, adapters/chargers, PC power supplies, inverters, communication power supplies, etc.)

    • Complies with ENERGY STAR and IEC 62301 measurement requirements.

    • Supports Manufacturing Information System (ShopFloor) interface.

    • The ATE power supply testing system supports testing of various power parameters under CV, CC, CR, LED modes.

    • Optimizes display mode, allowing for any combination of hardware configurations.

 

High-Speed

     • The ATE power supply testing system supports simultaneous testing of multiple single-group/multiple-group output power supplies, significantly increasing production line capacity. (The testing speed for LED power supplies/adapters/chargers is more than double that of the widely used 6000 series power automatic systems.)

     • Conducts parallel barcode scanning during testing, greatly improving testing speed.

 

Top-Smart 2000 ATE Power Supply Testing System Test Items:

Test items Comprehensive Test items
CEC test Short circuit test
DC Current under C.V.Mode Short circuit current
Peak-Peak noise OV protection
Serial reaction time test UV protection
Transient response time OL protection
Transient spike OP protection
Tracking In-test adjustment test
Voltage regulation AC cycle drop out
Current regulation PLD simulation
Turn ON time DC output current test
Rise time DC output voltage test
Fall time Waveform read test
Hold-up time Input impulse current test
Inrush current test Input power
Power good signal Relay control
Power fail signal Bar code scan
P/S ON signal Dynamic test
Power up sequence Specification under C.P.Mode
Power off sequence Input Peak current
Effciency test Additional expansion measurement test
Overall stability test Input RMS current
Fan Speed test TTL signal control
Input power factor LAN read/write
Input voltage ramp RS485 read/write
Input freq. ramp USB read/write
Extend the measurement test 232 read/write
Automatic test GPIB read/write

 

Power Supply ATE With High Voltage Test Power Supply Automatic Battery Comprehensive Tester 0