Dongguan Chuangrui New Energy Co., Ltd topfer99@126.com 86--13018677119
Product Details
Place of Origin: China
Brand Name: Topfer
Model Number: Top-Smart 1100
Payment & Shipping Terms
Minimum Order Quantity: one set
Price: to be discussed
Packaging Details: wooden crate
Delivery Time: 2 to 3 weeks
Payment Terms: T/T
Supply Ability: 10 sets /30 days
Color: |
Gray |
Simultaneously Measurable: |
4-16 Power Supply Products |
Altitude: |
1.7m |
Customizable: |
Yes |
Product Usage: |
Automatic Testing For Adapter Products |
Function: |
Rapidly Test The Performance Of Various Power Supply Products. |
Color: |
Gray |
Simultaneously Measurable: |
4-16 Power Supply Products |
Altitude: |
1.7m |
Customizable: |
Yes |
Product Usage: |
Automatic Testing For Adapter Products |
Function: |
Rapidly Test The Performance Of Various Power Supply Products. |
Power LED driver test instrument, driver power supply test equipment, LED power supply test system
The Top-Smart 1100 series of Industrial Power Supply Testing Systems uses the latest ATE testing system software V8.0:
The ATE power supply testing system can test input voltage, input current, input power, power factor, no-load and other machine power, current harmonics, frequency, input voltage and current waveforms, effective and average values of output current and voltage, output power, output current ripple, voltage ripple, power, etc. It can perform full-voltage testing, segmented testing, and power supply output discharge. With database storage and export, the test data of each product will be stored to meet the requirements of major clients for test data.
Top-Smart 1100 Industrial Power Supply Testing System Test Items:
Test items | Comprehensive Test items |
CEC test | Short circuit test |
DC Current under C.V.Mode | Short circuit current |
Peak-Peak noise | OV protection |
Serial reaction time test | UV protection |
Transient response time | OL protection |
Transient spike | OP protection |
Tracking | In-test adjustment test |
Voltage regulation | AC cycle drop out |
Current regulation | PLD simulation |
Turn ON time | DC output current test |
Rise time | DC output voltage test |
Fall time | Waveform read test |
Hold-up time | Input impulse current test |
Inrush current test | Input power |
Power good signal | Relay control |
Power fail signal | Bar code scan |
P/S ON signal | Dynamic test |
Power up sequence | Specification under C.P.Mode |
Power off sequence | Input Peak current |
Effciency test | Additional expansion measurement test |
Overall stability test | Input RMS current |
Fan Speed test | TTL signal control |
Input power factor | LAN read/write |
Input voltage ramp | RS485 read/write |
Input freq. ramp | USB read/write |
Extend the measurement test | 232 read/write |
Automatic test | GPIB read/write |