logo

Dongguan Chuangrui New Energy Co., Ltd topfer99@126.com 86--13018677119

Dongguan Chuangrui New Energy Co., Ltd Company Profile
products
Home > products > Power Supply Test System > Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data

Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data

Product Details

Place of Origin: China

Brand Name: Topfer

Model Number: Top-Smart 1100

Payment & Shipping Terms

Minimum Order Quantity: one set

Price: to be discussed

Packaging Details: wooden crate

Delivery Time: 2 to 3 weeks

Payment Terms: T/T

Supply Ability: 10 sets /30 days

Get Best Price
Product Details
Highlight:

Multi-Functional Power Supply Testing System

,

Driving Power Supply Testing Equipment

,

Multi-Functional Power Tester

Color:
Gray
Simultaneously Measurable:
4-16 Power Supply Products
Altitude:
1.7m
Customizable:
Yes
Product Usage:
Automatic Testing For Adapter Products
Function:
Rapidly Test The Performance Of Various Power Supply Products.
Color:
Gray
Simultaneously Measurable:
4-16 Power Supply Products
Altitude:
1.7m
Customizable:
Yes
Product Usage:
Automatic Testing For Adapter Products
Function:
Rapidly Test The Performance Of Various Power Supply Products.
Product Description

The multi-functional power supply testing system, driving power supply testing equipment, and power tester can save test data

 

Advantages of the TopFer 1100 Switching Power Supply Automatic Testing System:

      • Suitable for testing applications of AC/DC Power Supplies and DC/DC Converters.

      • High extensibility, easily integrating standardized interface testers.

      • Fast testing speed, 3-4 times faster than traditional ATS systems.

      • Open system platform, allowing for self-edited test steps according to requirements.

      • Standardized instrument control interface and graphical operating environment (Windows interface).

      • The TopFer 6600 switching power supply ATE provides report design and statistical analysis capabilities.

 

1. Acceptance: Conduct a comprehensive inspection and test of the functions and quality of the high-speed power supply testing system equipment to ensure they are consistent with the contract description. Fill out the project acceptance form and file it in the project archive. Promptly address any issues raised by the customer during the acceptance process. The acceptance is considered qualified only when qualified products are detected and the maximum benefits of the high-speed power supply testing system equipment are maximized.

 

2. Training: Provide training for the operators and maintenance personnel of the customer's high-speed power supply testing system. The customer's operators can participate in the debugging work of the high-speed power supply testing system. After it is used on-site at the customer's factory, another training will be conducted until the staff can operate and maintain the system normally.

 

3. Transportation, Installation and Commissioning: Chuangrui will transport the high-speed power supply testing system equipment to the customer's factory for free installation and commissioning. The customer's factory is responsible for assisting in positioning the equipment and providing the power sockets required for the equipment. Chuangrui will be responsible for the installation and commissioning work.

 

4. Warranty: The high-speed power supply testing system equipment is guaranteed for one year after the customer's commissioning and production. During the warranty period, Chuangrui shall be responsible for the free repair of equipment failures in the high-speed power supply test system. If the system components are damaged due to the design, manufacture or installation of Chuangrui, Chuangrui shall replace the system components free of charge. Accessories will be provided at the most favorable price outside the warranty period.

 

Test Items for the Switching Power Supply Testing System :

Test items Test items
Measuring under LED.Mode Tracking
DC Current under C.V.Mode Short circuit test
Peak-Peak noise Short circuit current
Current peak-Peak noise OV protection
Voltage peak-Peak noise UV protection
Transient response time OL protection
Transient spike OP protection
Voltage regulation In-test adjustment
Current regulation AC cycle drop out
Turn ON time PLD simulation
Rise time GPIB read/write
Fall time 232 read/write
Hold-up time USB read/write
Inrush current test TTL signal control
Power good signal Relay control
Power fail signal Bar code scan
P/S ON signal Dynamic test
Power up sequence Specification under C.P.Mode
Power off sequence DC output current
Effciency DC output voltage
Input RMS current Current Ripple test
Input power Dimming Current
Input power factor Dimming frequency
Input voltage ramp Dimming period
Input freq. ramp  

 

Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data 0