Dongguan Chuangrui New Energy Co., Ltd topfer99@126.com 86--13018677119
Product Details
Place of Origin: China
Brand Name: Topfer
Model Number: Top-Smart 1100
Payment & Shipping Terms
Minimum Order Quantity: one set
Price: to be discussed
Packaging Details: wooden crate
Delivery Time: 2 to 3 weeks
Payment Terms: T/T
Supply Ability: 10 sets /30 days
Color: |
Gray |
Simultaneously Measurable: |
4-16 Power Supply Products |
Altitude: |
1.7m |
Customizable: |
Yes |
Product Usage: |
Automatic Testing For Adapter Products |
Function: |
Rapidly Test The Performance Of Various Power Supply Products. |
Color: |
Gray |
Simultaneously Measurable: |
4-16 Power Supply Products |
Altitude: |
1.7m |
Customizable: |
Yes |
Product Usage: |
Automatic Testing For Adapter Products |
Function: |
Rapidly Test The Performance Of Various Power Supply Products. |
The multi-functional power supply testing system, driving power supply testing equipment, and power tester can save test data
Advantages of the TopFer 1100 Switching Power Supply Automatic Testing System:
• Suitable for testing applications of AC/DC Power Supplies and DC/DC Converters.
• High extensibility, easily integrating standardized interface testers.
• Fast testing speed, 3-4 times faster than traditional ATS systems.
• Open system platform, allowing for self-edited test steps according to requirements.
• Standardized instrument control interface and graphical operating environment (Windows interface).
• The TopFer 6600 switching power supply ATE provides report design and statistical analysis capabilities.
1. Acceptance: Conduct a comprehensive inspection and test of the functions and quality of the high-speed power supply testing system equipment to ensure they are consistent with the contract description. Fill out the project acceptance form and file it in the project archive. Promptly address any issues raised by the customer during the acceptance process. The acceptance is considered qualified only when qualified products are detected and the maximum benefits of the high-speed power supply testing system equipment are maximized.
2. Training: Provide training for the operators and maintenance personnel of the customer's high-speed power supply testing system. The customer's operators can participate in the debugging work of the high-speed power supply testing system. After it is used on-site at the customer's factory, another training will be conducted until the staff can operate and maintain the system normally.
3. Transportation, Installation and Commissioning: Chuangrui will transport the high-speed power supply testing system equipment to the customer's factory for free installation and commissioning. The customer's factory is responsible for assisting in positioning the equipment and providing the power sockets required for the equipment. Chuangrui will be responsible for the installation and commissioning work.
4. Warranty: The high-speed power supply testing system equipment is guaranteed for one year after the customer's commissioning and production. During the warranty period, Chuangrui shall be responsible for the free repair of equipment failures in the high-speed power supply test system. If the system components are damaged due to the design, manufacture or installation of Chuangrui, Chuangrui shall replace the system components free of charge. Accessories will be provided at the most favorable price outside the warranty period.
Test Items for the Switching Power Supply Testing System :
Test items | Test items |
Measuring under LED.Mode | Tracking |
DC Current under C.V.Mode | Short circuit test |
Peak-Peak noise | Short circuit current |
Current peak-Peak noise | OV protection |
Voltage peak-Peak noise | UV protection |
Transient response time | OL protection |
Transient spike | OP protection |
Voltage regulation | In-test adjustment |
Current regulation | AC cycle drop out |
Turn ON time | PLD simulation |
Rise time | GPIB read/write |
Fall time | 232 read/write |
Hold-up time | USB read/write |
Inrush current test | TTL signal control |
Power good signal | Relay control |
Power fail signal | Bar code scan |
P/S ON signal | Dynamic test |
Power up sequence | Specification under C.P.Mode |
Power off sequence | DC output current |
Effciency | DC output voltage |
Input RMS current | Current Ripple test |
Input power | Dimming Current |
Input power factor | Dimming frequency |
Input voltage ramp | Dimming period |
Input freq. ramp |