Dongguan Chuangrui New Energy Co., Ltd topfer99@126.com 86--13018677119
Product Details
Place of Origin: china
Brand Name: Topfer
Model Number: cdu
Payment & Shipping Terms
Minimum Order Quantity: one set
Price: to be discussed
Packaging Details: wooden crate
Delivery Time: 2 to 3 weeks
Payment Terms: T/T
Supply Ability: 10 sets /30 days
Temperature Range: |
-5°C To 25°C |
Evaporator Type: |
Shell And Tube |
Condenser Type: |
Plate Heat Exchanger |
Compressor Type: |
Scroll |
Controller Brand: |
Siemens |
Refrigerant Type: |
R410a |
Control System: |
Microcomputer |
Compressor Brand: |
Bitzer |
Power Supply: |
380V/3Ph/50Hz |
Evaporator Water Pump Brand: |
Grundfos |
Cooling Capacity: |
100kW |
Safety Protection: |
High And Low Pressure Protection, Overload Protection, Anti-freezing Protection |
Condenser Fan Brand: |
EBM |
Temperature Range: |
-5°C To 25°C |
Evaporator Type: |
Shell And Tube |
Condenser Type: |
Plate Heat Exchanger |
Compressor Type: |
Scroll |
Controller Brand: |
Siemens |
Refrigerant Type: |
R410a |
Control System: |
Microcomputer |
Compressor Brand: |
Bitzer |
Power Supply: |
380V/3Ph/50Hz |
Evaporator Water Pump Brand: |
Grundfos |
Cooling Capacity: |
100kW |
Safety Protection: |
High And Low Pressure Protection, Overload Protection, Anti-freezing Protection |
Condenser Fan Brand: |
EBM |
FINAL ASSEMBLY OF CDU COLD LIQUID DISTRIBUTION UNIT
The Cold Liquid Distribution Unit (CDU) finished product testing system is designed for electrical component wire sequence detection, internal temperature sensor testing, and flow meter calibration of assembled CDU products. It also monitors liquid temperature, flow rate, inlet and outlet pressure, and pressure differential. By heating the liquid at a constant power using a thermostatic water tank and circulating it with the CDU, the system checks whether the liquid temperature remains constant.
The final assembly of a CDU (Cold Liquid Distribution Unit) involves several critical steps to ensure proper functionality, efficiency, and safety. A CDU is typically used in fueling stations to cool and dispense diesel fuel. Here’s an overview of the final assembly process:
Installation of the Tank:
Connecting Piping and Hoses:
Mounting the Pump:
Integrating the Heater:
Assembling the Control System:
Installing the Dispenser Nozzle:
Wiring Electrical Components:
Insulating the System:
Implementing Safety Features:
Final Testing and Calibration:
Documentation and Inspection:
By following these steps carefully, you can ensure that your CDU is assembled correctly, functioning efficiently, and ready for reliable operation.