Dongguan Chuangrui New Energy Co., Ltd topfer99@126.com 86--13018677119
Product Details
Place of Origin: China
Brand Name: Topfer
Model Number: Top-Smart 2000
Payment & Shipping Terms
Minimum Order Quantity: one set
Price: to be discussed
Packaging Details: wooden crate
Delivery Time: 2 to 3 weeks
Payment Terms: T/T
Supply Ability: 10 sets /30 days
Color: |
Gray |
Simultaneously Measurable: |
4-16 Power Supply Products |
Altitude: |
1.7m |
Customizable: |
Yes |
Product Usage: |
Automatic Testing For Adapter Products |
Function: |
Rapidly Test The Performance Of Various Power Supply Products. |
Color: |
Gray |
Simultaneously Measurable: |
4-16 Power Supply Products |
Altitude: |
1.7m |
Customizable: |
Yes |
Product Usage: |
Automatic Testing For Adapter Products |
Function: |
Rapidly Test The Performance Of Various Power Supply Products. |
The charger adapter comprehensive testing equipment saves you costs and improves testing efficiency
The automatic power supply detection system is widely used in various power supply industries, supporting comprehensive detection of power adapters, mobile phone chargers, power banks, mobile power banks, LED driver power supplies, PC power supplies, TV power supplies, computer power supplies, inverter power supplies, communication power supplies, industrial power supplies, switching power supplies, etc. All these power supply products need to use the ate power supply automatic detection system to test the performance and quality of the power supply, strictly controlling the quality of the power supply products
Advantages of the series of Industrial Power Supply Testing Systems:
Industrial Power Supply Testing System Test Items:
Test items | Comprehensive Test items |
CEC test | Short circuit test |
DC Current under C.V.Mode | Short circuit current |
Peak-Peak noise | OV protection |
Serial reaction time test | UV protection |
Transient response time | OL protection |
Transient spike | OP protection |
Tracking | In-test adjustment test |
Voltage regulation | AC cycle drop out |
Current regulation | PLD simulation |
Turn ON time | DC output current test |
Rise time | DC output voltage test |
Fall time | Waveform read test |
Hold-up time | Input impulse current test |
Inrush current test | Input power |
Power good signal | Relay control |
Power fail signal | Bar code scan |
P/S ON signal | Dynamic test |
Power up sequence | Specification under C.P.Mode |
Power off sequence | Input Peak current |
Effciency test | Additional expansion measurement test |
Overall stability test | Input RMS current |
Fan Speed test | TTL signal control |
Input power factor | LAN read/write |
Input voltage ramp | RS485 read/write |
Input freq. ramp | USB read/write |
Extend the measurement test | 232 read/write |
Automatic test | GPIB read/write |